Project 5262011 Interior Alterations & 3rd Floor Addition
Construction Manager: EAGA Company, LLc Architect: TMH Associates Engineer: Guest Engineering Contractor: EAGA Company, LLC Location: Philadelphia, PA Demolition phase in preparation of 3rd floor addition and interior alterations Assessment of existing joist pockets to level 2nd floor Lower joist pockets indicate level of existing roof now removed and to be abandoned Assessment of existing roof rafters to be removed and replaced in preparation of new new rubber roofing system for entire 3rd floor roof. Inquiries about this project can be directed to Eric A. Godbolt at 215-395-6220 To follow this project updates, Project 5262011