Posts

Showing posts with the label remodeling

Custom Kitchen Remodel

Image
CUSTOM KITCHEN  Project Scope:   Complete kitchen restoration - remove all metal cabinets, lighting and fixtures. Disconnect all plumbing and electrical components. Prepare kitchen for new installations.  Project S.F.   800 SF (total coverage) Project Materials:   Honey Maple Cabinetry - AC Kitchens                                   Stainless Steel Cabinet Hardware                                   Sherwin Williams Paint                                   Cabinet Wall Framing, Drywall and Finishing                                   Laminate Flooring                    ...

Window Refurbishing

Image
Project Scope:   Repair and preserve exterior wooden window frame. Project S.F.  30 (total coverage 3 coats) Project Materials:   Sherwin Williams Project Labor:  16 man-hours  Project Zip Code:  19139  CALL US at 1-888-684-5501 Fypon material used for header, cut to fit and anchored to wall.  Exterior wood trim treated and coated. Project Scope:   Scrape and repair existing wood and metal surfaces.  Make ready for new 2 vinyl replacement windows Project S.F.  35 (total coverage 3 coats) Project Materials:   Sherwin Williams Project Labor:  16 man-hours  Project Zip Code:  19139  CALL US at 1-888-684-5501 Two double pane insulated vinyl window units with half screen . New exterior trim square stock, sealed and painted.

Freshly Painted

Image
Great Prices !!!!  available on e nhancing your homes cub appeal and strengthening your value with surface treatment and fresh paint. FOR FREE ESTIMATES AND A PROFESSIONAL APPROACH CALL 1-888-684-5501

Colors and Accents

Image

Managing successful Home Improvement and Construction Projects

Check out this SlideShare Presentation: Managing successful Home Improvement and Construction Projects View more presentations from Eric Godbolt .