Posts

Showing posts from November, 2011

Project 5262011 Interior Alterations & 3rd Floor Addition

Image
Construction Manager: EAGA Company, LLc Architect: TMH Associates Engineer: Guest Engineering Contractor:  EAGA Company, LLC Location: Philadelphia, PA Demolition phase in preparation of 3rd floor addition and interior alterations Assessment of existing joist pockets to level 2nd floor Lower joist pockets indicate level of existing roof now removed and to be abandoned Assessment of existing roof rafters to be removed and replaced in preparation of new new rubber roofing system for entire 3rd floor roof. Inquiries about this project can be directed to Eric A. Godbolt at 215-395-6220 To follow this  project updates,  Project 5262011

EAGA Project 5262011 Interior Alterations & 3rd Floor Addition

Image
Construction Manager: EAGA Company, LLc Architect: TMH Associates Engineer: Guest Engineering Contractor: Design Builders Location: Philadelphia, PA Project Description: Interior Alterations & 3rd Addition to convert an existing 2 1/2 story single family structure into a 3 story structure with 3-1 bedroom apartments. Each apartment features central air, hardwood floors, ceramic tile bathrooms, lighting and stainless steel appliances. The 2nd & 3rd floor apartments will also feature outdoor pressure treated decks. The project is being coordinated and managed by EAGA Company, LLc and is schedule for completion by February 1, 2012. Inquiries about this project can be directed to Eric A. Godbolt at 215-395-6220 To follow this blog for project updates, Search EAGA Project 5262011